01 Armstrong utilities Solutions Pvt Ltd, Chennai INDIA Pipe Stress Analysis for Steam Line
  • Preparation of Pipe Stress Isometric Drawing
  • Performance of Pipe Stress Analysis using CAESAR II Software.
02 Quest Global Pvt Ltd, Bangalore BLENOD
  • Pipe Stress Analysis – HRSG Piping
03 Jurong Engineering Ltd., Singapore M.H.I. Japan
2 x 50MW MW Diesel Engine driven Power Plant at Siem Reap, Cambodia.
  • Piping Layouts & Sections
  • Pipe Support Layouts
  • Piping Isometrics
  • Pipe Support Detail Drawings
  • Piping & Support B.O.M
04 Thermax Ltd., Pune NRI Power & Steels for Captive Power Plant. Piping Detailed Engineering
  • Piping Layouts & Sections
  • Pipe Stress Analysis
  • IBR Documentation
  • Piping Isometrics
  • Pipe Support Detail Drawings
  • Piping & Pipe Support B.O.M
05 Thermax Ltd., Pune Devi  Priya  Papers Captive Power  Plant Piping Detailed Engineering
  • Piping Layouts & Sections
  • Pipe Stress Analysis
  • IBR Documentation
  • Piping Isometrics
  • Pipe Support Detail Drawings
  • Piping & Pipe Support B.O.M
06 Thermal Systems (Hyderabad) Pvt. Ltd., Hyderabad. Hindustan Zinc Ltd – Waste Heat Recovery Boiler Piping Detailed Engineering
  • Piping Layouts & Sections
  • Pipe Stress Analysis
  • IBR Documentation
  • Piping Isometrics
  • Pipe Support Detail Drawings
  • Piping & Pipe Support B.O.M
07 Thermal Systems (Hyderabad) Pvt. Ltd., Hyderabad Vizag Steel Plant – Waste Heat recovery Boiler Piping Detailed Engineering
  • Pipe Stress Analysis
  • Piping Isometrics
  • Pipe Support Detail Drawings
  • Piping & Pipe Support B.O.M
08 Thermal Systems Hyderabad) Pvt Ltd., Hyderabad Shyam DRI Power Ltd Piping Detailed Engineering
  • Pipe Stress Analysis
  • Piping Isometrics
  • Pipe Support Detail Drawings
  • Piping & Pipe Support B.O.M
09 Thermal Systems Hyderabad) Pvt Ltd., Hyderabad Tokyo Cement Company (Lanka) Ltd Piping Detailed Engineering
  • Piping lay out
  • IBR Stress Calculation
  • Pipe Stress Analysis
  • Piping Isometrics
  • Pipe Support Detail Drawings
  • Piping & Pipe Support B.O.M
  • Piping support lay out.
10 Quest Global Pvt Ltd, Bangalore Benxi2 – Multistage Gas Compressor Piping, Siemens, Germany Pipe Stress Analysis
11 Quest Global Pvt Ltd, Bangalore Interstage Gas Compressor Piping, Siemens, Germany Pipe Stress Analysis
12 Indian Oil Tanking Ltd., Mumbai NLC – TPS II Expansion – Neyveli
2 x 250MW
2 x 250 MW NLC TPS – II Expansion, Neyveli – Prebid Engineering – Civil & Structural and Electrical scope.
  • Condenser Cooling Water System
  • Service Water System
  • Potable Water System
  • Firefighting System.
13 Thermodyne Technologies Pvt. Ltd., Chennai L & T ECC Chennai, 56 TPH Oil Fired Boiler Piping Detailed Engineering
  • Piping Layouts & Sections
  • Pipe Stress Analysis
  • IBR Documentation
  • Piping Isometrics
  • Pipe Support Detail Drawings
  • Piping & Pipe Support B.O.M
14 GEA cooling Towers Technologies(India)Pvt Ltd Kamachi Sponge and Power Ltd.
  • Pipe Stress Analysis
15 G.B. Engineering Enterprises Pvt. Ltd., Trichy 59 MW Arkay Energy Pvt Ltd .  Valantharaval, Tamilnadu Piping Detailed Engineering
  • Pipe Stress Analysis
  • Pipe Support Engineering
16 GEA cooling Towers Technologies(India) Pvt Ltd Kamachi Sponge and Power Ltd. Piping Detailed Engineering
  • Piping lay out
  • Piping Isometrics
  • Pipe Support Detail Drawings
  • Piping & Pipe Support B.O.M
17 Walchandnagar industries, Pune Aurobindo Agro Energy (P) Ltd
2 x8.5 MW Bio Mass based Power Plant
Piping Detailed Engineering
  • Piping Layouts & Sections
  • Pipe Stress Analysis
  • IBR Documentation
  • Piping Isometrics
  • Pipe Support Detail Drawings
  • Piping & Pipe Support B.O.M.
18 The Indian Hume Pipe Co. Ltd., Chennai East Coast Constuctions & Industries Ltd- Chennai. 2 x 250MW NLC TPS – II Expansion Neyveli  Pre-bid Engineering – Piping
  • Condenser Cooling Water System
  • Service Water System
  • Potable Water System
  • Firefighting System
19 East Coast Constructions Ltd., Chennai NLC – TPS II Expansion - Neyveli Pre-bid Engineering - Instrumentation
  • Condenser Cooling Water System
  • Service Water System
  • Potable Water System
20 Armstrong Utilities Solutions Pvt Ltd, Chennai Nestle – Steam & Water Systems Piping Detailed Engineering
  • Piping lay out
  • Piping Isometrics
  • Stress Analysis
  • Pipe Support Detail Drawings
  • Piping & Pipe Support B.O.M
21 SPB Projects & Consultancy Ltd., Chennai. West Coast Papers Mills Ltd, Dandelli, Karnataka, India Stress Analysis and BOM preparation of the following steam Systems:
  • HP Steam
  • MP Steam
  • LP Steam
22 Armstrong Utilities Solutions Pvt Ltd, Chennai Nestley, Bicholim, Goa Piping Detailed Engineering
  • Piping lay out
  • Piping Isometrics
  • Stress Analysis
  • Pipe Support Detail Drawings
  • Piping & Pipe Support B.O.M
23 Vici Engineers & Consultants Pvt. Ltd., Chennai 59 MW CCPP HRSG Valantharavai Tamil Nadu. Arkay Energy Pvt Ltd. Hyderabad
  • Equipment Layout
  • Piping material Specification
  • Piping Layouts & Sections
  • Pipe Stress Analysis
  • IBR Documentation
  • Piping Isometrics
  • Pipe Support Detail Drawings
  • Piping & Pipe Support B.O.M.
24 Vici Engineers & Consultants Pvt. Ltd., Chennai ST – CMS 250MW LFPP – Uthangal. Modification of Piping due to addition of Stand by fan for Gland Steam Condenser –Neyveli.
  • Piping Layouts & Sections
  • Pipe Stress Analysis
  • Piping Isometrics
  • Pipe Support Detail Drawing.
25 Vici Engineers & Consultants Pvt. Ltd., Chennai ST – CMS MW LFPP, UTTHANGAL - NEYVELI Modification of Waste water Piping
  • Piping Layouts & Sections
  • Piping Isometrics
  • Pipe Support Detail Drawing.
  • Piping & Pipe Support B.O.M.
26 Vici Engineers & Consultants Pvt. Ltd., Chennai

GEA India

Air Fin Cooler Division – Chennai
Pipe Stress Analysis for gas piping
27 Vici Engineers & Consultants Pvt. Ltd., Chennai For Enmas Andritz, Chennai  

2 x 150 MW COG/BFG fired Boiler for Goa Energy Pvt. Ltd., Goa.
Piping Detailed Engineering
  • Equipment Layout
  • Piping Layouts
  • Pipe Stress Analysis for Feed water & Steam Piping – CAESAR II
  • IBR Strength Calculation
  • Piping Isometric Drawings
  • Pipe Support Engineering
  • Piping & Pipe Support B.O.M
28 Mech-Tech Projects, Chennai PASCH - 50MW Agro based power plant - Spain. Pre-bid Engineering.
29 Mech-Tech Projects, Chennai Babcock - Spain Digitization of Pressure Vessel Drawings.
30 Armstrong Utilities Solutions Pvt Ltd, Chennai Coco Cola Plant Ohio Pre-Bid Engineering
31 Armstrong Utilities Solutions Pvt Ltd, Chennai Post Cereal, USA Digitization of 8 P & ID’s for Steam and Water System.
32 Servalakshmi Papers Ltd, Tirunelveli, INDIA Trouble shooting of Steam Turbine exhaust duct Expansion bellow failure.
  • Conduction of Site Visit and observe the failure details.
  • Perform Pipe Stress Analysis and report reasons for failure and provide alternate solutions to overcome this problem.
  • Prepare Design calculations for new Pipe Sopports.
  • Perform Secondary Steel Structure Analysis using Staadpro.
  • Perform Steel Detailing.
  • Perform Foundation Design Calculation.
 
     
 
 
  Project  
line
   
line
   
line
   
line
   
line
   
line
   
line
   
line
   
line
   
line
   
line
   
line
   
line
   
line
© Copyright Focus Projects & Consultants Site Designed by RR Solutions