03 |
Penspen International Ltd, Abu Dhabi |
3” & 6” Oil Line for Qatar Petroleum |
Stress Analysis and Report Preparation of 1 to 4 Km of Cross Country Pipeline - 5 separate lines |
04 |
Penspen International Ltd, Abu Dhabi |
3” & 6” Natural Gas Line for Qatar Petroleum |
Stress Analysis and Report Preparation of 1 to 4 Km of Cross Country Pipeline - 5 separate lines |
05 |
ISEA Middle East W.L.L, Bahrain |
Tawi Town - Oman |
Prebid Engineering Services, Sewage Treatment Plant – 800m3/day
Cross Country Pipeline. |
06 |
ISEA Middle East W.L.L, Bahrain
(Through RV Enviro Watertech Pvt. Ltd., Coimbatore |
Malco - Mettur |
Prebid Engineering Sewage Treatment Plant 150KL/day
Cross Country Pipeline |
07 |
Nicco Corporation Ltd
Kolkata |
ONGC-Karaikal |
Buried Pipeline for 61Kms.
Flow Media-Hydro Carbon |
08 |
GEA Energy System (India) Ltd., Chennai
Power Projects Division |
3 x 110 MW CCPP Dholpur, River Water Cross Country Piping & Pipeline Detailed Engineering for 11 Kms. |
3 x 110 MW CCPP Dholpur, River Water Cross Country Piping Detailed Engineering.
- Alignment drawings
- Pipe Wall Thickness Calculation (Above ground/ Buried)
- Piping Layouts for Pumping station, etc.
- Pipe Stress Analysis using CAESAR II
- Pipe Fittings (Mitre Bends, Reducers, Tees) Fabrication drawings
- Pipe Support Detail Drawings.
- Piping B.O.M
|
09 |
Tolani Fabricators, Ankeshwar, Gujarat |
10” gas line for ONGC Karaikkal for 15 Kms |
Total Engineering Design and Detailed Engineering
- Pre-Engineering Survey
- Post Engineering Survey
- Detailed Engineering for
- Mechanical Equipments
- Piping Design
- Pipeline Design
- Civil & Structural Design
- Electrical Design & Cathodic
Protection
- Instrumentation Design
|